Productivity in process plant engineering: Aspects and examples
For centuries, division of labor has been the recipe to improve productivity—dividing an organizational set of tasks into smaller tasksets, as assigned to individuals.
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.