Rameshni, M.
Minimize carbon footprint from Claus tail-gas units
Environment & Safety
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Carbon Management
/ Catalysts
/ Construction
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Gasoline
/ Greenhouse Gases
/ Heat Transfer
/ Loss Prevention
/ Middle East
/ Octane
/ Safety
/ Treating
Reevaluate emissions efficiencies on sulfur-removal operations
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Renewable fuels project in Canada begins production 4/19
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction