Wolschlag, L. M.
Increase FCC processing flexibility by improved catalyst recycling methods
Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Biofuels
/ Catalysts
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Middle East
/ Octane
The dynamic global refining market emphasizes the need for greater operating flexibility in the fluid catalytic cracking (FCC) unit.
Upgrade FCC performance—Part 1
New ceramic feed distributor offers ultimate erosion protection
Upgrade FCC performance—Part 2
New ceramic feed distributor offers ultimate erosion protection
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell pivots back to oil to win over investors 6/9
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction