Mulholland, D.
Dan Mulholland is a global sales director for Trinity Integrated Systems Ltd. (TIS), and he has worked through the introduction of a new concept of physically distributed control systems in hazardous and harsh environments while working with GE Intelligent Platforms and, formerly, Measurement Technology Ltd. Mr. Mulholland has lectured both BSc and MSc curriculums in mechatronics at Leeds University and is introducing lifecycle management solutions focused on automating Phase 4 activities with TIS.
Effectively execute legacy safety systems migration—Part 2
In this two-part article, the challenges of migrating legacy safety systems are reviewed, along with the means of repeatedly and effectively executing compliant migrations. Part 2 reviews the tools-assisted process and further explores how to achieve the required compliance, quality, efficiency and rigor.
Effectively execute legacy safety systems migration—Part 1
This two-part study will investigate the challenges of migrating legacy safety systems, and review effective means of repeatedly and effectively executing compliant migrations.
Enabling the refinery of the future—Safety first
Within this “new” economy, automation systems must be capable of delivering new levels of productivity and scalability, while ensuring safety, managing globalizations and addressing new workforce demographics.
- 1
- ... 1 pages

- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units