Valleur, M.
In-line laboratory and real-time quality management
An in-depth look at NIR spectroscopy
Capture the long-term benefits of operator training simulators
Here are the prerequisites, pitfalls and vision for the future
Optimize short-term refinery scheduling
Constraints, different mathematical programming techniques and integrating scheduling subsystems must be considered
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Technip Energies and Anellotech to jointly develop sustainable plastics recycling 4/22
- BHP says it aims to receive first ammonia-fueled bulk carrier in 2026 4/22
- Biofuels refiner Ecoceres expects Malaysia unit to start up in second half 2025 4/22
- Neste successfully concludes its first processing run with pyrolysis oil from discarded tires 4/22
- NextChem advances plastic upcycling with NX Replast technology, boosting the circular economy 4/22
- BASF now offering polyamides for the textile industry according to Recycled Claim Standard 4/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction