Robling, D.
Doug Robling is the Business Development Manager for Schneider Electric’s US Services division. He has been with Schneider Electric for more than 30 yr in various engineering, operations and sales positions. Prior to Schneider Electric, Mr. Robling spent 10 yr with the Public Service Co. of Indiana, an investor-owned gas and electric utility.
Getting onboard with modernization
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Utilities
While electrical equipment typically has a lengthy lifespan, it is not meant to last, or be relevant, forever.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
- Hapag-Lloyd and Seaspan to retrofit five vessels to methanol propulsion 4/19
- U.S. EPA to announce temporary expanded sales of higher-ethanol gasoline blend 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction