Al-Qahtani, A. A.
is a Hydrocarbon Measurement Engineer with more than 6 yr of experience with Saudi Aramco, mainly in the field of custody/royalty measurement systems. He has developed multiple uncertainty calculation models related to fiscal measurement systems and earned a BS degree in mechanical engineering from King Fahad University of Petroleum and Minerals.
Expect the unexpected: Estimation of uncertainty in custody measurement
Uncertainty in input parameters does not have an identical effect on uncertainty in the output.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction