Kwon, O.
Ohgeon Kwon is a Principal Consultant and Structural Integrity Team Lead at Quest Integrity. Dr. Kwon has more than 25 yr of experience and expertise in high-temperature creep, FFS and remaining life assessments for various components in the petrochemical, refining and power generation industries. He earned his PhD at Imperial College, London.
Case studies: Evaluation of the soundness and remaining life of PSA vessels with weld defects
Multiple defects were found in pressure swing adsorption (PSA) vessels during an outage of one of four PSA process units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction