Durr, C.
Consider new approach for floating LNG units
Combined technical expertise for onshore and offshore LNG facilities reduces risks and capital costs for new installations
LNG technology—The next chapter
Technical challenges of new plants will involve the sizing of trains, construction cost controls, onshore vs. offshore, energy efficiencies and environment
North American LNG terminals: Options?
Several critical factors should be considered when designing receiving facilities
Select the optimum extraction method for LNG regasification
Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Renewable fuels project in Canada begins production 4/19
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction