Boul, J.
Jonathan Boul is the Product Manager for Forum’s oil treating technologies. A former nuclear submariner, he began his career in the electrostatic field with Petreco in the early 2000s. He continued his work there until joining Forum upon its acquisition of Howe-Baker.
Flexibility in desalting operations for opportunity crudes
Crude oil
/ Engineering & Design
/ Process Optimization
/ Refining
/ Treating
/ Middle East
/ Americas
/ Asia/Pacific
/ Africa
Typically, opportunity crudes require more rigorous desalting to yield high-quality products due to high levels of naphthenic acids, basic sediment and water (BS&W) and filterable solids, among others.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- NETL goes deep to develop new biocatalysts for carbon conversion 6/9
- Shell pivots back to oil to win over investors 6/9
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- Nigerian regulator links Exxon to illegal lifting of petroleum from terminal 6/9
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction