Chow, M.
Munchoong (MC) Chow is a Modernization Consultant with Emerson. He collaborates with customers to create new initiatives for modernizing their legacy process automation systems. His role encompasses both consulting and business development, focusing on the refining/hydrocarbon processing industry. Chow has more than 30 yr of experience in process automation, with the past 20 yr spent with Emerson and an Emerson Impact Partner. He earned a BS degree in control systems and instrumentation engineering from City, University of London, England and is a Certified Functional Safety Professional.
Shift focus to more open control technology
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
Plant control system modernizations that are necessary to meet today’s goals and strategies often come with organizational hurdles.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction