Safariyeganeh, S.
Sara Safariyeganeh has been with Elessent Clean Technologies (formerly DuPont Clean Technologies) for 10 yr. Her work is focused on the process engineering, design and commissioning of DynaWave® wet scrubbing systems for refining and industrial applications. This includes experience working with sulfur recovery units, incinerators and sulfuric acid plants. Earlier in her career, Ms. Safariyeganeh worked in cement production for Buzzi Unicem USA. She earned a chemical engineering degree from the Missouri University of Science and Technology.
Cleaning mud oil incineration offgases
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Sulfur
/ Treating
The sustainable management of petroleum exploration and refining requires appropriate treatment and disposal of the oily waste generated.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction