Dixit, P.
Pramod Dixit works as a freelance consultant operating from Baroda, India. He provides informative lectures and training to engineers working in engineering, operations, inspection and maintenance groups of process plants and engineering companies. He has more than 44 yr of experience working at different positions in Indian companies, including Engineers India Ltd., L&T-Chiyoda Baroda, and ESSAR Offshore and Subsea Ltd. in greenfield and brownfield projects. He earned a BTech degree (mechanical) from IIT Roorkee India.
Project Management: Check installation of the tray column before box-up
To push the project schedule, plant owners sometimes proceed the boxing up of columns without approval of the tray designer.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Renewable fuels project in Canada begins production 4/19
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction