Admar Bueno has worked nearly 10 yr in the petrochemicals and energy sectors. He is a Process Engineer at Braskem’s Camaçari ethylene plant in Brazil, where he oversees pyrolysis furnace performance.
Energy losses from the radiant firebox wall of pyrolysis furnaces
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Loss Prevention
/ Natural Gas
/ Americas
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Technip Energies and Anellotech to jointly develop sustainable plastics recycling 4/22
- BHP says it aims to receive first ammonia-fueled bulk carrier in 2026 4/22
- Biofuels refiner Ecoceres expects Malaysia unit to start up in second half 2025 4/22
- Neste successfully concludes its first processing run with pyrolysis oil from discarded tires 4/22
- NextChem advances plastic upcycling with NX Replast technology, boosting the circular economy 4/22
- BASF now offering polyamides for the textile industry according to Recycled Claim Standard 4/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction