Nava, J.
Optimize operating parameters of absorbers/strippers in gas plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gas to liquids (GTL)
/ Heat Transfer
/ Middle East
/ Naphtha
Better recovery definition of C3s and C4s from gas absorber/stripper can lower costs
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
- Technip Energies selected by Viridor to perform FEED on the Runcorn energy-from-waste carbon capture project in the UK 4/23
- SINOPEC completes its involvement in Kazakhstan's polyethylene project 4/23
- Neste premieres at Chinaplas: showcasing possibilities of bio-based and recycled materials for plastics 4/23
- Russia's oil refining near 11-month low 4/23
- Haiti fuel terminal operations halted as gangs seize trucks 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction