Maintenance & Reliability
Case 57: Troubleshooting the cause of sudden impacts
Finding the cause can be elusive but calculations help
HP Reliability: Not ready for 29-year-old pump packing
In 2009 we were informed about “a nuclear plant that was never commissioned after its original construction. This plant has been sitting idle for 29 years and is only now starting up.” The o..
Furnace tubes-enhancing safety and efficiency with infrared thermography
Thermal imaging offers advantages over thermocouples
Troubleshooting waste-heat boiler poor heat transfer
Analytical results showed that potash leached from the catalyst, refractory powder, corrosion products and, to a lesser extent, catalyst fines resulted in tube fouling
Purging and inerting large-volume tankage and equipment-jet mixing concept-Part 2
Recommendations for the design, installation and testing of jet mixing systems
Case 56: Quick troubleshooting of shaft failures
Some simple calculations can guide the way to improved performance
Flow-induced fatigue failure
Case histories describe a variety of failures and solutions
Purging and inerting large-volume tankage and equipment—jet mixing concept—Part 1
Here are the advantages and disadvantages of the various methods
Heat-exchanger failure analysis in a naphtha cracking unit
This case history analyzed the failure and makes recommendations to prevent future failures
Oil-mist lubrication for fin-fan shafts
Tests show it is superior to grease lubrication
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5

