Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Engineering & Design

Energy management toolkit available soon

The US Department of Energy’s Industrial Technologies Program (ITP) is in the process of developing the Energy Management Toolkit.

Foster Wheeler and consortium partners sign GES+ contract with Saudi Aramco

Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group together with the subsidiary’s consortium partners comprising A. Al-Saihati, A. Fattani & O. Al-Othman Consulting Engineering Co., (SOFCON) and Saudi Consolidated Engineering Company- Khatib & Alami (SCEC K&A) have signed a contract with Saudi Aramco for the provision of services associated with Saudi Aramco’s General Engineering Services Plus (GES+) initiative for a duration of five years with options available for extensions.

Foster Wheeler studying ZADCO in the UAE

Foster Wheeler AG’s Global Engineering and Construction Group has received a contract from Zakum Development Company (ZADCO), to perform an availability and reliability study in connection with the expansion of the Zirku oil processing facilities in Abu Dhabi, UAE.

Improving pH control mitigates corrosion in crude units

Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections

Avoid brittle fracture in pressure vessels

Chagalesh Consulting Engineers: Khazrai, F.  |  Haghighi, H. B.  |  Kordabadi, H.

Key points identify effects from auto-refrigeration on steel vessels

Flare stack structure revamp: A case history

Reliance Industries Ltd.: Singh, S.

An innovative approach was used to repair an older flare structure online without an extensive shutdown

Process safety: Blind spots and red flags

Mustang Engineering Inc.: Shephard, T.

Improving safety for organizations involve more than technological solutions; understanding processes and plant interactions are a must

Case 61: Pressure loss in a reactor

Consulting Engineer: Sofronas, A.

Much information is available from a simple analysis

Avoid these top-10 instrumentation headaches

AVEVA: Gibson, D.

Visual engineering program solves designer and engineer issues across the industry

HP Reliability: Oil mist and electric motor windings

Hydrocarbon Processing Staff: Bloch, Heinz P.

We often get questions relating to oil mist and how it affects electric motor windings. For a quick answer, contact us at Gulf Publishing via e-mail. We’ll steer you in the right direction by exp..