Acid Gas Removal
Optimize operating parameters of absorbers/strippers in gas plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gas to liquids (GTL)
/ Heat Transfer
/ Middle East
/ Naphtha
Better recovery definition of C3s and C4s from gas absorber/stripper can lower costs
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- UMI Coatings launches to bring advanced protective coatings solutions to a range of industries 4/8
- Iowa (U.S.) biodiesel leaders applaud Grassley effort urging RFS biofuels Increase 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction