Engineering and Construction
When ‘mega’ goes ‘GIGA’—A discussion on the Sadara petrochemical complex
After the Engineering Construction Contracting (ECC) association’s 2017 PerspECCtives conference, Ashraf Ayoub, part of the ECC’s board of directors, was able to sit down with Joseph Brewer, Chief Implementation Officer of Sadara, to exchange thoughts on the implementation of the $20-B Sadara petrochemical complex project.
Building for the future: An analysis of global capacity additions
Over the past several years, the world has witnessed significant capacity growth in all sectors of the downstream hydrocarbon processing industry (HPI). The majority of this growth has taken place in Asia-Pacific, the Middle East and the US
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

