Engineering and Construction
When ‘mega’ goes ‘GIGA’—A discussion on the Sadara petrochemical complex
After the Engineering Construction Contracting (ECC) association’s 2017 PerspECCtives conference, Ashraf Ayoub, part of the ECC’s board of directors, was able to sit down with Joseph Brewer, Chief Implementation Officer of Sadara, to exchange thoughts on the implementation of the $20-B Sadara petrochemical complex project.
Building for the future: An analysis of global capacity additions
Over the past several years, the world has witnessed significant capacity growth in all sectors of the downstream hydrocarbon processing industry (HPI). The majority of this growth has taken place in Asia-Pacific, the Middle East and the US
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- Technip Energies awarded two large contracts by BPCL for new units at Bina and Mumbai refineries in India 1/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

