Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

GTT receives an order from Hyundai Heavy Industries for the design of the tanks of two new LNG Carriers

GTT has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) for the tank design of two LNGCs on behalf of a European shipowner.

Each vessel will offer a capacity of 174,000 m3. GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system. Deliveries of the vessels are scheduled for the fourth quarter of 2022 and the third quarter of 2023 respectively.

Philippe Berterottière, Chairman and CEO of GTT, declared: "We are pleased with the confidence placed in us by HHI, a partner with whom GTT has developed a long-term collaboration.”

From the Archive

Comments

Comments

{{ error }}
{{ comment.name }} • {{ comment.dateCreated | date:'short' }}
{{ comment.text }}