Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

KBR awarded pre-FEED study for Indonesian LNG regas project

KBR has been awarded a pre-front end engineering and design (FEED) study for Australasia LNG Indonesia's (AALNG) proposed LNG Hub terminal in Probolinggo, East Java, Indonesia. This is KBR's first contract with AALNG.

Under the terms of the contract, KBR will provide a pre-FEED study for the onshore LNG regasification and truck loading distribution facilities of AALNG's proposed LNG Hub Terminal. The pre-FEED study will be further developed for subsequent implementation phases to meet a throughput capacity of 3 MMtpy. The terminal could potentially be expanded by adding more LNG Regas trains and LNG storage to meet future demands in the East Java region. This work is expected to be performed over ten weeks, with KBR performing the pre-FEED study through an integrated team led by LNG expertise from KBR's London office with support from KBR's Jakarta office and its Granherne subsidiary.

Related News

From the Archive

Comments

Comments

{{ error }}
{{ comment.name }} • {{ comment.dateCreated | date:'short' }}
{{ comment.text }}