Technip in on ground floor of Ghana gas processing plant project
10/27/2010 12:00:00 AM
The contract covers the engineering, welding and installation of a 14 kilometer-long rigid steel flowline as well as the engineering, fabrication and installation of one PLET. The flowline will constitute the deep water section of a pipeline which will be used to pipe natural gas from the Jubilee field to the future onshore processing plant.
Comments