March 2019
Valves, Pumps and Turbomachinery
Cut costs and save time servicing valves during refinery turnarounds
Most refineries perform turnaround activities every 3 yr–5 yr to maintain and upgrade plant assets and equipment.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Transform gas metering and pipeline monitoring through digitalization: Is hydrocarbon dewpoint a dependable metric?
- Mercaptan recombination in naphtha hydrotreating units: A startup challenge
- Trade-off analysis between fired heater safety logic and operability: Challenges of excessive safety instrumentation


Comments