Calculate thermal growth of a fractionation tower for piping engineering
The fractionation tower/column is common processing equipment in the petroleum refinery and chemical industry.
IP: 18.116.89.70
This is a preview of our premium content. Thank you for your interest—please
log in or
subscribe to read the full article.
The Authors
Darji, P. - L&T-Chiyoda Ltd., Vadodara, India
Pradeep P. Darji is a Group Leader for the piping stress group at L&T- Chiyoda Ltd. India. He holds an MS degree in mechanical engineering from the University of Pune. Mr. Darji has more than 18 yr of experience in piping stress analysis and piping troubleshooting for refineries and petrochemical plants.
Chaube, N. - L&T-Chiyoda Ltd., India
N. Chaube graduated with a degree in mechanical engineering from Birla Institute of Technology, Mesra, India, in 1987. He has over 27 years of experience in oil, gas and other process industries, having worked with leading engineering and consultancy firms through MECON Ltd. and L&T-Chiyoda Ltd. During his job tenure, Mr. Chaube has been involved in working with different standards of major companies, including Shell Global, Technip, Fluor, EIL, ADCO and ARAMCO. He has worked in various capacities in design, including the troubleshooting of major industrial plants. At present, he serves as the head of plant and piping at L&T Chiyoda Ltd., Baroda, India.
Dave, N. - L&T-Chiyoda Ltd., Baroda, India
works as a senior piping stress engineer at L&T-Chiyoda Ltd., Baroda, India. He holds a master’s degree in mechanical engineering from Nirma University. He has six years of experience in piping stress analysis for refinery and petrochemical plants.
Related Articles
From the Archive
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction
Comments