Reducing energy costs while improving efficiency
Better energy management can make the difference between profit and losses. The question facing owner-operators is: how to reduce energy costs while satisfying site energy needs?
IP: 18.227.0.255
This is a preview of our premium content. Thank you for your interest—please
log in or
subscribe to read the full article.
The Authors
Ruiz, D. - Soteica Visual MESA, Spain
has 20 years of experience in computer-aided technologies to enable sustainable manufacturing. He joined the Soteica Visual MESA team in 2002 and has participated directly in the implementation of online models for energy optimization in 15 refineries and petrochemical complexes. Dr. Ruiz earned a chemical engineering degree from Universidad Tecnológica Nacional—Facultad Regional Rosario, and a doctorate degree in chemical engineering from Universitat Politècnica de Catalunya.
Morrón, G. - Repsol Química, Spain
is manager of the process engineering department at the Repsol Química Tarragona complex.
Alonso, D. - Repsol Química, Spain
holds an MS degree in chemical engineering and a postgraduate MS degree in refining, petrochemicals and LNG. He has seven years of professional experience as a process engineer for different oil and gas companies, including activities performed during basic, FEED and detailed engineering studies. Mr. Alonso has four years of onsite experience at the Repsol Química Tarragona petrochemical complex.
Bolíbar, Á. - Soteica Visual MESA, Spain
has two years of experience working in Visual MESA Energy Management and Optimization. He joined Soteica Visual MESA in 2011 as an industrial consultant. He holds a degree in chemical engineering from Universitat Politécnica de Catalunya.
Ruiz, J. P. - Soteica Visual MESA, Spain
is the optimization specialist and senior developer at Soteica Visual MESA. He obtained his BS degree in chemical engineering at the Universidad Tecnologica Nacional (UTN) in 2003 and his PhD in chemical engineering (process optimization) at Carnegie Mellon University (CMU) in 2011. Dr. Ruiz has more than 10 years of experience developing and implementing computer-aided tools to improve the design and operation of industrial processes.
Related Articles
From the Archive
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction
Comments