A. DeLancey
Adam DeLancey has been with WIKA since 2004. He has served in various roles within the organization, starting as a CADD designer and Product Manager at WIKA Canada and working as a Global Product Manager and R&D Manager for the last several years. He focuses on special applications for temperature measurement, including tubeskins, multipoints and thermowells. He earned a degree in engineering design and drafting, and a C.E.T. with ASET.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras signs on with Baker Hughes for sweeping gas turbines service agreement 3/18
- TwinThread launches Perfect Batch, an AI-powered analytics solution to optimize batch production 3/18
- bp to block union workers from Whiting refinery 3/18
- Analysis: Licocene Terra, using renewable carbon in hot melt polymers for adhesive formulations 3/18
- Ionautics finds breakthrough in iridium-based porous catalyst layer technology for green hydrogen production 3/18
- thyssenkrupp nucera supplies electrolyzers for Moeve’s green hydrogen project 3/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

