Racette, Y.
Yves Racette is Principal Process Optimization Support Engineer at Valero Energy Corp. His areas of expertise are data historian systems and process unit monitoring.
Use advanced predictive analytics for early detection and warning of column flooding events
In this study, a methodology was implemented to predict crude distillation tower flooding events based on key process variables, including product yields, column pumparound (PA) flowrates, column temperatures and overhead reflux flowrate.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Air Products exits three U.S. projects, takes write down not to exceed $3.1 B 2/25
- H2 station from ethanol begins testing phase at Cidade Universitária in Brazil 2/25
- Eni to use Nextchem's gasification technology to produce circular methanol and hydrogen 2/24
- Russia signs memorandum to build port, oil refinery in Myanmar 2/24
- Chimbusco delivers largest marine biofuel bunker stem in Hong Kong 2/24
- Brazil's Petrobras to create 'biorefinery,' powered by $960-MM investment 2/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction