Azizoğlu, Z.
Zeynep Azizoğlu is a Process Chief Engineer, responsible for troubleshooting, monitoring and processing of the KTU and LPG Merox units at the Tupras’ Izmit refinery. She previously worked at TU Delft as a guest researcher. She earned a BS degree in chemical engineering and materials engineering from Istanbul Technical University (ITU), and an MS degree in materials engineering and nanotechnology from Politecnico di Milano.
FCC and HDS feed flexibility and integration with the delayed coker in the Izmit refinery
Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrotreating
/ Loss Prevention
/ Naphtha
/ Natural Gas
/ Sulfur
/ Treating
/ Europe
Operational flexibility is one of the key parameters that leads to success and sustainability in refinery production.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Dow Chemical, X-energy to advance nuclear project at Dow's Seadrift chemicals facility (U.S.) 3/31
- Varo buys Swedish refiner Preem in bet on biofuels 3/31
- Cenovus refinery in Ohio (U.S.), plans to shut multiple units for 6 weeks for maintenance 3/31
- INEOS Enterprises completes the sale of INEOS Composites to KPS Capital Partners for €1.7 B 3/31
- Willis Sustainable Fuels selects FT CANS to boost sustainable aviation fuel production in the UK 3/31
- Uganda signs deal with UAE investment firm over 60,000-bpd oil refinery 3/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction