Myers, D. B.
Duane B. Myers is a Process Engineer with Trimeric Corp. He assists clients with process engineering projects, including overpressure protection. Mr. Myers has 25 yr of engineering experience and holds BS and MS degrees in chemical engineering from the University of Delaware and the Massachusetts Institute of Technology, respectively.
Solve PRV and piping capacity problems—Part 2
Engineers often uncover problems or inadequacies with pressure relief valve (PRV) and relief system piping capacities that need creative and cost-effective solutions.
Solve PRV and piping capacity problems—Part 1
Engineers often uncover problems or inadequacies with pressure relief valve (PRV) and relief system piping capacities that need creative and cost-effective solutions.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BPCL and National Sugar Institute collaborate to advance sweet sorghum as a sustainable biofuel source 2/21
- Resynergi secures $18 MM to accelerate plastic recycling innovation 2/21
- LiqTech receives supplier approval for water treatment system for WinGD dual-fuel engine 2/21
- Japan's Eneos shuts 141,000-bpd Sakai CDU after a fire 2/21
- Russia's idle oil refining capacity estimated 82% up in February 2/21
- U.S. refiners mull switch to alternative lighter crudes amid Trump tariff fears 2/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction