Brun, L. A.
Laurent-Alain Brun is a Process Engineer based in TOTAL Research and Technology in Gonfreville, France. He oversees troubleshooting and process support for crude units for TOTAL Refining and Chemicals. He has 25 yr of experience in refining process support for projects and operation. He earned chemical engineer degrees from Mines de Nancy and ENSPM in Rueil-Malmaison, France.
TOTAL refineries improve overhead systems corrosion and salting with amine-neutralizing technology
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Corrosion
/ Crude oil
/ Engineering & Design
/ Environment
/ Equipment
/ Reactors
/ Europe
Weak organic amines are commonly used in crude unit overhead systems to prevent acidic corrosion from chlorides and other acidic contaminants via a neutralization reaction.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction