Walter, J. P.
Jonathan P. Walter is the Business Development Manager for TLV Corp. He previously served as general manager of TLV’s International Consulting and Engineering Services group, where he gained extensive experience helping refineries and chemical plants optimize the performance of their steam systems. Mr. Walter earned a BEng degree in electronic engineering from the University of Sheffield in the UK and is a UK Chartered Engineer (CEng). He also holds qualifications as a Certified Energy Manager, a Professional Energy Manager and a U.S. Department of Energy (DOE) Steam Specialist.
Impact plant performance by improving the steam system
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Heat Transfer
/ Turbines
Petrochemical plants and refineries face production and profitability challenges on multiple fronts.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction