Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- IEA comes under pressure from former oil market chief to cut energy transition focus 1/30
- Emerson to acquire remaining outstanding shares of AspenTech 1/30
- Bahri, Petredec partner to meet Saudi Arabia’s growing LPG and ammonia shipping needs 1/30
- Indian state studies plan to ban petrol, diesel vehicles in Mumbai to control pollution 1/30
- SQUAKE and NX Group partner to offer CO₂ insets to NX Group’s customers 1/30
- Repsol to use Enerkem's advanced gasification technology for its Ecoplanta facility in Spain 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction