Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
- Day 2 of WGLC 2024 begins with Chevron speaker’s inspiring, relatable message 11/21
- MOL Group, KazMunayGas partner on exploring petrochemical production 11/21
- WGLC: Innovating AI adoption 11/21
- Solvay uses waste wood to power soda ash and bicarbonate plant in Germany 11/21
- Syensqo expands U.S. production capacity for advanced polymers 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction