Garrido, E.
Erik Garrido is the Mechanical Discipline Chief at Summum Projects. Mr. Garrido has more than 17 yr of experience in the engineering, procurement and construction business, with a wide background in heat transfer and pressure vessel equipment.
Considerations for revamping shell-and-tube heat exchangers
Construction
/ Engineering & Design
/ Equipment
/ Heat Transfer
/ Maintenance & Reliability
/ Refining
Revamp projects are complex in nature, and demand a great deal of resources for successful completion.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction