Gentry, J.
Joseph Gentry is Senior Vice President of licensing and technology for Sulzer GTC Technology, headquartered in Houston, Texas. Mr. Gentry earned a BS degree in chemical engineering from Auburn University and an MBA from the University of Houston. He is one of the founders of GTC Technology, which is now owned by Sulzer Chemtech. Mr. Gentry has worked in all areas of technology, licensing and business development.
Business Trends: A sustainable future—Unraveled
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Economics
/ Engineering & Design
/ Environment
/ Greenhouse Gases
/ Management
/ People
/ Products
With the prominence in the oil and gas industry around sustainability, it is worthwhile to examine what it means to be “sustainable.”
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction