Yang, Q.
Quan Yang is a Sulzer Senior Technical Expert, specializing in mass transfer components. He is in charge of air separation knowledge management within Sulzer Chemtech. Recently, his field expanded to process optimization for DWC. He holds a PhD in environmental engineering from the National University of Singapore.
Dividing wall columns for fatty acids fractionation
The use of dividing wall columns (DWCs) has been a hot topic over the past decades, as DWCs can potentially bring huge savings in operational costs and capital investment.
CFD study of mixing performance of redistribution systems for packed columns
The maldistribution of liquid flow within long packed beds is a well-known phenomenon in distillation and absorption columns. In a packed column, the maldistribution of liquid results in differences in liquid concentration across the column.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction