Krishnamoorthy, S.
Senthil Krishnamoorthy is a Key Application Specialist for Sulzer Chemtech USA. With more than 20 yr of experience, he is responsible for column design in major olefins and styrene projects around the globe. He has published several technical articles on distillation column design and troubleshooting and holds one European patent for column internals. He has served as a member of the FRI Design Practices Committee since 2020. Krishnamoorthy received an MS degree in chemical engineering from the Regional Engineering College in India.
C3, splitter revamp case study emphasizes importance of balancing in four-pass trays to achieve separation efficiency and capacity
The C<sub>3</sub> splitter in an olefins plant is one of the most important and critical pieces of equipment: it separates polymer-grade propylene from propane.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction