Tekebayev, K.
Kaiyr Tekebayevis a Process Engineer at Sulphur Experts, specializing in the commissioning and startup of sulfur and amine facilities. He is passionate about developments in the renewable energy industry and is working toward obtaining an MS degree in renewable energy engineering from the University of Aberdeen.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

