Kim, E.
Eunho Kim is a Junior Engineer on the Stationary Equipment Engineering team at SK energy. He is in charge of the FCCU, and has 5 yr of experience in detailed design and maintenance of equipment. He earned a BS degree in mechanical engineering from Inha University in South Korea.
Case study: Extend tube life in a waste heat boiler
Maintenance & Reliability
/ Refining
/ Boilers
/ Economics
/ Heat Transfer
/ Safety
/ Sulfur
/ Asia/Pacific
The sulfur recovery unit (SRU) separates sulfur from sulfur compounds.
Three topics for operational excellence related to a Cr-Mo hydrotreating reactor
Many end users are trying to use feedstock with higher sulfur content for their refineries to increase profitability, but numerous unknown or plausible bottlenecks exist.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- UMI Coatings launches to bring advanced protective coatings solutions to a range of industries 4/8
- Iowa (U.S.) biodiesel leaders applaud Grassley effort urging RFS biofuels Increase 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction