Diezinger, S.
Stefan Diezinger is the Vice President of Industrial Solutions Sales for the EU&AF region at Siemens Energy, where he provides digital and integrated solutions for electrification and decarbonization of various industries. Dr. Diezinger earned an MS degree and a PhD in process engineering from FAU Erlangen-NĂĽrnberg, and a Bch degree in business administration from the University of California at Berkley.
Transitioning to an electrified future
Carbon Management
/ Compressors
/ Drivers
/ Engineering & Design
/ Equipment
/ Gasification
/ Greenhouse Gases
/ Heat Transfer
/ Hydrogen
/ Natural Gas
/ Petrochemicals
/ Process Optimization
/ Products
/ Pumps
/ Refining
/ Rotating Equipment
/ Turbines
/ Utilities
As countries responsible for 75% of greenhouse gas (GHG) emissions set net-zero targets, oil and gas, chemicals and other energy-intensive process industries are under increasing pressure to decarbonize.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction