Singh, D.
Meeting diesel specifications at sustained production
Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Gasification
/ Gasoline
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Middle East
/ Octane
/ Reactors
New approach rethinks operations of crude and vacuum distillation units to recover more distillate
Redesign crude preheater train for efficiency
Over design of heat exchangers sourced to fouling problems
Improve natural gas liquids recovery
Designing for temperature variations does impact operating costs and unit efficiencies
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction