Singh, D.
Meeting diesel specifications at sustained production
Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Gasification
/ Gasoline
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Middle East
/ Octane
/ Reactors
New approach rethinks operations of crude and vacuum distillation units to recover more distillate
Redesign crude preheater train for efficiency
Over design of heat exchangers sourced to fouling problems
Improve natural gas liquids recovery
Designing for temperature variations does impact operating costs and unit efficiencies
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction