Roy, S.
Decrease tube metal temperature in vacuum heaters
Various options for reducing the TMT of a vacuum heater, such as changing the transfer line size and adding extra surface area in the radiation and convection sections, are examined here. The best option generally depends on the limitations under which the heater operates with regard to the process requirements and the downstream equipment limitations and flexibility.
Evaluate challenges in meeting clean-fuel specifications with heavier crude
Process Optimization
/ Refining
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Engineering & Design
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Information Systems
/ Management
/ Middle East
/ Octane
/ Reactors
At a Saudi Aramco refinery, a revamp was planned for processing a different crude oil blend to meet Euro 5 diesel and gasoline specifications. The refinery, which processes semi-light crude oil, is sc..
Debottleneck crude-unit preheat exchanger network inefficiencies
Simulation models can be effectively used to optimize heat transfer and boost operational performance
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BPCL and National Sugar Institute collaborate to advance sweet sorghum as a sustainable biofuel source 2/21
- Resynergi secures $18 MM to accelerate plastic recycling innovation 2/21
- LiqTech receives supplier approval for water treatment system for WinGD dual-fuel engine 2/21
- Japan's Eneos shuts 141,000-bpd Sakai CDU after a fire 2/21
- Russia's idle oil refining capacity estimated 82% up in February 2/21
- U.S. refiners mull switch to alternative lighter crudes amid Trump tariff fears 2/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction