Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ketjen announces pricing adjustment for hydroprocessing catalysts effective January 15, 2026 1/9
- Germany's Uniper nears agreement to buy green ammonia from India 1/9
- Digital Exclusive—Valve maintenance: An open and shut case? 1/9
- Serbia's Russian-owned NIS refiner buys first crude since U.S. sanctions waiver 1/9
- U.S. refiner Marathon Petroleum says it will be bidding for Venezuelan crude oil 1/9
- Shell flags chemicals and products unit loss, raising doubts over $3.5 B buyback 1/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

