Alshaikh, A.
Ahmed Alshaikh is a Process Modeling and Optimization Engineer at Saudi Aramco. He has experience in planning, scheduling and supply chain optimization of Saudi Aramco’s downstream business, including refining, terminal and distribution networks. In addition, Mr. Alshaikh has recently focused on the applications of the process digital twin and operational data analytics to the downstream oil and gas industry. He earned a Bch degree in chemical engineering from Heriot-Watt University in Scotland, and is pursuing his MS degree in business analytics and big data from IE University in Madrid.
Enhanced unit monitoring enabled by digital twin
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrocracking
/ Information Systems
/ Loss Prevention
/ Reactors
/ Middle East
Process engineers must continuously monitor the health and performance of process units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction