Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Técnicas Reunidas will carry out the engineering services to develop one of Europe’s largest green methanol plant 3/11
- ABB signs agreement with Dow as the automation partner to support Path2Zero ethylene complex in Canada 3/11
- HIF Global awarded first U.S. approval for e-Fuels design pathway 3/11
- Indonesia to build oil refineries with total capacity of 1 million bpd 3/11
- WasteFuel and ITC commence front-end engineering design on world-scale green methanol facility in Ankara, Turkey 3/11
- Crude shipments on Druzhba pipeline suspended after drone attack, Hungary says 3/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction