Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Shell flags chemicals and products unit loss, raising doubts over $3.5 B buyback 1/8
- Saudi's SABIC sells assets in Europe, Americas worth $950 MM 1/8
- Outokumpu to collaborate with Norsk e-Fuel to convert carbon side streams into eSAF 1/8
- Haffner Energy and IGNIS P2X launch bio/eSAF project AeroVerde in Spain 1/8
- Faerch advances circular packaging leadership with growing rPET volumes from Cirrec 1/8
- Aether Fuels receives millions of additional funding to accelerate SAF production in Singapore 1/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

