Al-Zahrani, M.
Majed Al-Zahrani is an Electrical Engineer at Saudi Aramco’s Riyadh refinery with 13 yr of experience in plant technical and project tasks. His work experience is focused on plant technical issues; project design reviews; compliance assurance for standards, procedures and material specifications; site construction and commissioning; operations support; and troubleshooting and fault investigation. Mr. Al-Zahrani holds a BS degree in electrical engineering from King Abdulaziz University in Jeddah, Saudi Arabia.
Valves, Pumps and Turbomachinery: Using 3D metallic printing for manufacturing refinery pump impellers
Additive manufacturing (AM), also known as 3D metallic printing, is identified as one of the game-changing technologies in recent years for the oil and gas industry.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction