Al Turiki, A.
Abdullah Al Turiki is a Khurais Producing Department Technical Advisor with more than 15 yr of experience in rotating equipment. He joined the company as a machinist and then focused on rotating equipment after joining the reliability unit as a technical advisor. His experience includes troubleshooting, condition monitoring and leading reliability programs. The author can be reached at Abdulah.turiki@aramco.com.
High-pressure gas compressor dry gas seal system enhancement case study
The Khurais producing department (KhPD) consists of four oil trains: each oil train is responsible for receiving, stabilizing and purifying the crude oil from the wells by removing sand, water, gas and hydrogen sulfide (H2S) contents to make the oil ready for use and shipment to refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction