Al Turiki, A.
Abdullah Al Turiki is a Khurais Producing Department Technical Advisor with more than 15 yr of experience in rotating equipment. He joined the company as a machinist and then focused on rotating equipment after joining the reliability unit as a technical advisor. His experience includes troubleshooting, condition monitoring and leading reliability programs. The author can be reached at Abdulah.turiki@aramco.com.
High-pressure gas compressor dry gas seal system enhancement case study
The Khurais producing department (KhPD) consists of four oil trains: each oil train is responsible for receiving, stabilizing and purifying the crude oil from the wells by removing sand, water, gas and hydrogen sulfide (H2S) contents to make the oil ready for use and shipment to refineries.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction