Al-Subaie, M.
Mmajed Al-Subaie is a Process Engineer at Saudi Aramco with demonstrated experience in upstream operations. He has 7 yr of experience in gas operation fields as he led the commissioning of the gas treat unit in one of Saudi Aramco’s main facilities (Fadhili Gas Plant). Prior to that, he was assigned as a Lead Process Engineer at the Shaybah Gas Plant. Mr. Al-Subaie holds professional engineering, energy manager and energy auditor certificates.
Soft startup of best practices for the commissioning of amine plants
The startup and commissioning of hydrocarbon plants can present unique challenges that, if not anticipated and addressed in the pre-commissioning and commissioning periods, will inhibit plant startup and increase the difficulty of achieving product specifications in a timely manner.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction