Al-Sanad, A.
Abdullmajeed Al-Sanad is a Process Engineer at Saudi Aramco. He works with the Process and Control Systems Department within the Flare and Relief Systems Group. He has 8 yr of experience. Al-Sanad has been involved in major tasks at the company, such as NGL recovery plant commissioning and Saudi Aramco’s decarbonization strategy development. He has also led several milestones in the company’s flaring minimization programs. He earned a BS degree in chemical engineering from King Fahd University of Petroleum and Minerals (KFUPM).
Direction of cost-effective carbon capture and storage technologies
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Refining
/ Carbon Management
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Management
/ Piping
/ Middle East
Around the world, many nations and companies are transitioning toward the decarbonization of energy.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Nigeria's NNPC stake in Dangote refinery reduced over non-payment 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction