Biramov, K.
Prevent external corrosion of boiler tubes under refractory lining
Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Construction
/ Corrosion
/ Drying
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Safety
/ Utilities
A leak developed on the water wall for several boiler tubes within five months of the commissioning of a plant boiler. In this case, the boiler tubes were partially covered with a castable refractory ..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
- U.S. liquid fuels groups announce progress on E15, small refinery exemption reform 12/5
- Million Air and Avfuel bring SAF to Austin, Texas (U.S.) 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

