Matheys, J.
Joe Matheys has worked for Rockwell Automation since 2011 and began as an Applications Engineer for the CENTERLINE 2100 product line. He later transitioned to the product management team for IntelliCENTER & Intelligent Packaged Power and is now responsible for low-voltage drives software. Mr. Matheys earned a BS degree in mechanical engineering from the University of Minnesota.
Digital Technology: Cut oil and gas lifecycle costs with intelligent packaged power
Oil and gas companies have realized big cost savings over the years by having suppliers source all elements of the electrical control system in a fully integrated package. However, this methodology fell short of delivering the kind of insights and efficiencies that companies expect and require in oil and gas operations today.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction